Mengtai Beiyuan 2×660MW Thermal Power Plant

Mengtai Beiyuan 2×660MW Thermal Power Plant is a project under construction by the company. The project is located in Dongsheng District, Ordos City, Inner Mongolia Autonomous Region, and is solely invested by Inner Mongolia Mengtai Group Co., Ltd. The construction scale of the project is 2×660MW high-efficiency ultra-supercritical coal-fired heating units, and simultaneous construction of desulfurization and denitrification devices. The project will start construction in August 2020 and is expected to be completed and put into operation by the end of 2022.


The project adopts the world's advanced design technology, combined with the large slope height difference and narrow site characteristics of the site, and uses three-dimensional digital technology to truly simulate the surrounding urban environmental facilities and topography, and rationally plan the general plan of the plant. Focus on comprehensive optimization from the main engine parameters, equipment selection, coal conveying system, public system, air-cooled island, foundation engineering, slope engineering, main plant engineering and other aspects, so as to achieve less land, project investment and less resource consumption. Lay the foundation for the construction of high-efficiency, clean, ecological, green, energy-saving, environmentally friendly, safe and reliable, technologically advanced, and city-friendly power plants.


The land for the general layout of the project is about 16.5hm2, which is about 49.21% less land than similar projects. The thermal efficiency of the power plant is 45.66%, the standard coal consumption of power generation is 269.36g/kwh, the thermal efficiency of the power plant is 59% under the annual working condition of heating, and the standard coal consumption of power generation is 242.94g/kwh.


The project is planned to provide heating for the urban area of Dongsheng District. It is an urban infrastructure project related to the national economy and people’s livelihood. It can replace the existing high-energy, high-emission 4×25MW units and scattered small boilers in the area, and not only can provide stable and reliable supply for the city. The heat load also has comprehensive benefits such as saving energy, improving the environment, and improving heating quality. It is an economical and environmentally friendly project that the state strongly supports and supports from the policy.