蒙泰集团 

热电板块

Heating Business

一. Business handling location:
Users of the Mengtai heating zone can apply at the following two locations:
1. For the heating area to the east of Tianjiao Road and west of Zhungeer Road, please go to Tianjiao Business Hall, address: Jinhui Building A, diagonally opposite to Huaxia Bank.
2. For the heating area to the west of Tianjiao Road and east of Wanzheng Road, please go to the business hall of Chuangye Building, address: West side of Block A of Chuangye Building.
二. Steps for users to pay heating fee:
(1) Sample payment
1. Dial 4000477996 to query the user code.
2. Enough APP payment
(1) Download the App or follow the official account


Enough App WeChat Official Account
(2) Enter "My" in the store "My"-click "heating payment"-enter "user code"-verify user information and pay-enter the referrer's mobile phone number (registered member of the sample, optional)-complete payment .
(3) To check the rebate, click "My-Change Balance" to check the rebate. You can spend and pay for heating in designated shopping malls and supermarkets.
(2) Bank payment
Users can go to the following banks to pay the heating fee:
Business outlets of rural commercial banks Business outlets of Agricultural Bank
Business branches of Industrial Bank Business branches of Bank of China
三, how to brush cartoon warm
After the IC smart meter card is recharged, place the smart card above the smart meter in the pipeline well for 4-5 seconds. If the smart meter does not display, please contact the manager of the heating area of Mengtai.
四. Handling other heat supply services
(1) Handle the business of heating suspension and restoration
1. Handling time for suspension of heating: from August 1 to September 30 each year, overdue will not be accepted.
2. Information provided by the office for heating shutdown and restoration: real estate certificate and owner's ID card.
3. When handling the heating service, the user should cut off the heating pipeline by himself (including smart card users), and pay the basic heating fee at the same time; you can also apply for our company to assist in the heating shutdown or restoration of the heating business, and the costs incurred by the heating shutdown or restoration It is the responsibility of the user.
(2) Handling new heating services
1. The heat user shall provide free housing for the district heating and heat exchange station.
2. The design drawings of the heat-supply pipe network must be reviewed and approved by the heat-supplying party, and the construction must be carried out in strict accordance with the construction standards and requirements of the heat-supplying party. Heating can only be carried out after the heating party has passed the acceptance.
3. Wall insulation of heat-used buildings must meet national standards, and the heating system must be controlled by households, including garages, commercial and office buildings, and household-specific intelligent control systems must be installed in accordance with the requirements of the heating party.
4. After the heating party officially accepts the heat application, the new heating procedures will be completed within 7 working days.
New heating users provide the following information:
※Real estate users prepare the following materials:
(1) One copy of hot application in writing and one copy of business license and corporate ID card.
(2) Examination and approval documents for heat use projects: two copies of construction project planning permit and state-owned land use permit□
(3) Two copies of the general layout drawing and elevation drawing of the thermal project (1:1000) (electronic version and paper version)□
(4) Two copies of the layout drawing of the pipeline network of the heat project (1:1000) (electronic version and paper version)□
(5) Two copies of indoor heating, floor heating, and central air conditioning construction drawings (electronic version)□
(6) Two copies of final test report □ two copies of drawing area □ two copies of preliminary test report □
※Individual users prepare the following information:
Real estate certificate, purchase contract online, copy of ID card
5. The heat user shall pay the construction cost of the pipe network construction at one time from the date of signing the heat supply and use contract, and the heat supply company shall begin pipe network design, heat exchange station equipment order, pipeline installation, and heat exchange station equipment installation.
6. After the user pays the heating fee, the heating company issues a heating notice to the user to open the valve for heating.
(3) Handle the business of changing the account name
1. The user prepares the information: the purchase network signs the contract or the real estate certificate, the copy of the ID card.
2. Go to the business hall and fill in the resident information change form to change the account name.
(4) Handle the business of changing the heating area
1. The user prepares information: a copy of the real estate certificate and ID card.
2. Go to the business hall and fill in the area change form to handle the area change.